Development of project documentation

11 Июля 2025

Development of sections of project documentation

 

Promanalit" company offers professional services for the development of sections of the project documentation of the facility for compliance with environmental requirements and norms in the field of construction, ecology and environmental protection. Development of coordination and approval of project documentation is carried out in the shortest possible time and is accompanied by professional specialists.


Design and planning are one of the first, most important stages of construction of any purpose. The final result, the appearance of the building, compliance with the requirements for its operation, and cost depend on how competently the projects are executed. That is why it is so important that the design and estimate documentation does not contain errors and inaccuracies.

 

Construction norms of the Republic of Kazakhstan

Based on the Law of the Republic of Kazakhstan dated 16.07.2001. ‘On construction, town-planning, architectural’ activities, as well as the regulation on the ‘Ministry of Infrastructure Development and Industry’, which is approved by the governmental bodies, certain construction norms on the management of technical regulation and norms in the construction sphere and infrastructure are established.

This legislation regulates the relations that arise between a legal/individual entity and a government agency in the performance of construction/architectural works. It is developed with the purpose of forming a full-fledged environment for people's life activity.

The development of such documents is necessary not only because it is established by law. Construction of structures according to the projects is able to solve such problems:

  • determination of compliance of objects constructed from scratch with the norms of technical regulations;
  • setting of design specifications;
  • preparation of estimates for the budget for construction works;
  • prevention of unforeseen costs, with a significant reduction in the total cost of works;
  • obtaining permits for activities;
  • minimising errors, both for executors and customers.

In addition, the development of sections of the project documentation is necessary when putting facilities into operation and maintenance of structures, taking into account their purpose.

 

Procedure for development of project documentation

 

The development of project documentation for a factory or other institution is carried out comprehensively. It includes different stages:

 

  • studying the object for design (all legislative norms and nuances are taken into account).
  • signing contracts with customers;
  • collecting necessary information for further development;
  • detailed analysis of all data (with sketching, creating models of structures);
  • the result is sent to clients for approval;
  • developing a package of design documentation (with coordination in state authorities, obtaining permits for construction).

 

Designing is possible both before the start of construction works and in the process of reconstruction of an old structure (dismantling, redesign of the building/facade). Projects include construction components, all safety requirements, technical rules, environmental protection regulations are met.

If the construction/reconstruction of objects in a protected area (with conservation or historical and cultural significance) is planned, the development of design documentation for environmental protection is additionally performed.

Procedure for approval of project documentation

 

The procedure for the development of coordination and approval of project documentation includes:

 

  • obtaining a technical task, which specifies possible works;
  • coordination of arising issues with the customer, specifying errors and ways of their elimination;
  • execution of the project;
  • making changes to the technical passport after inspection by the commission;
  • coordination with the body of architecture and town planning.

 

The specialist visits the site at the time agreed with the customer. The source documents are checked. At this stage, the direction of the engineering communication is agreed upon. The works are performed on the basis of the concluded contract.

 

Approval procedure

 

Upon completion of the work by the engineering company, the finished projects will be submitted for review (to obtain legal and regulatory status and to confirm that the document is accurate and complies with the requirements of SNIP of the Republic of Kazakhstan).

Necessary conditions for approval:

  • full compliance with the rules of execution;
  • a complete list of required documents drawn up correctly, without errors;
  • all documents must be drawn up taking into account the applicable rules and regulations.

Design documentation will be accepted if it meets construction standards, norms of the Town Planning Code, requirements of technical regulations. Approval is carried out by competent officials after expert examination, making amendments (if necessary), agreeing on all the nuances. Upon completion, the project is registered. Approval procedures in each situation are determined taking into account the type of objects, as well as the requirements for them.

Types of projects

 

Each of these types is included in a specific section of the project documentation:

  • Master plans (with area, building contours, topographical features, assessment of landscaping);
  • General drawing. All details of architecture, building appearance, schemes in transverse/longitudinal sections and location of communications are indicated;
  • Drawings of elements. For a complex assembly (specification, geometric dimensions are indicated);
  • Explanatory Notes. With detailed information and arguments of why these options will be optimal design solutions;
  • Calculation. With the results of hydraulic, chemical-physical, thermal, aerodynamic and other calculations;
  • Estimates. In the form of appendices to the documents or a separate section.

 

Composition of design and working documentation

 

Design documentation consists of planning schemes of land plots, explanatory notes, architectural, planning-volume, structural solutions, information on engineering equipment, technical-engineering communications, list of measures for environmental protection, technical tasks and ideas, other documents stipulated by law.

Composition of working documentation: structural and technological solutions of linear objects, projects for construction organisation, fire safety, estimates, explanatory notes, solutions aimed at special conditions, other documents stipulated by the legislation of the Republic of Kazakhstan.

 

Prices for design works in Kazakhstan

 

The price of the project is calculated individually in each case. Settlements are made on a pay-as-you-go basis, after the documentation has been signed. After the contracts are signed, all the work is done by the company - from 100% interaction with state authorities to solutions/approvals of arising issues.

The design and estimate documentation gives developers a clear idea of the upcoming financial costs. The calculation is based on the working documentation.

Specialists of Promanalit Design Bureau will develop turnkey projects competently, promptly and professionally.

You will receive a complete package of documentation with the necessary calculation, agreed within the framework of the laws.

 

 